• (+233) 302 977 153
  • 16 Odoom Street, East Legon, Accra

Let’s Build Your Future Together

We ensure best output with secure environment

Benefit of the socie where we operate. A success website obusly needs great design to be one of the top 10 IT companies in India but the web design is not enough.

Health & Safety

Pure Integrity

Environment

Eco Friendly

SUSTAINABILITY Committed to keep people healthy & safe

Benefit of the socie where we operate. A success website obusly needs great design to be one

We are best in the field

Benefit of the socie where we operate. A success website obusly needs great design to be one of the top 10 IT

Sustainability

Project on time

Modern Tech

Latest Design

Our Services Quality Services

Obuasi

Continental Gold Resources has drilled 129 diamond drill holes for a total of 27,883 metres ranging in length  up to 602 metres and averaging approximately 200 metres

Nkansu Area

The Nkansu Area is located 2.5 kilometers to the south west of the Pokukrom East and West Prospects

Sika North Odumasi Area

This area has had a limited amount of scout drilling along the northern most 4 kilometers of the FZ1 structure. Twenty-three holes totaling 2,788 metres have been completed of which 9 are diamond drill holes, 7 RC holes and 7 AirCore holes

Pokukrom Area

The Pokukrom East and West mineralization areas are located in the central-eastern portion of the Bibiani Project. These prospects were included in the 2013 Bibiani Resource Study.

Nfante Areas

A total of 57 drill holes (8674m) have been completed along the southeast margin of the property boundary at the Nfante West, Nfante Central, and Nfante East Prospects.

Bibiani

Continental Gold Resources has discovered seven near surface areas of gold mineralization along a 9-kilometre trend of multiple structures

Client's Love Testimonials​

0

Revenue in 2017 (Million)

0

Collaegues & Counting

0

Successfully Project

0

Year of experience

Latest News Latest Media​